West Crude Substation

Bath Engineering designed and supervised the construction of a new 15kV/5kV/480V substation building with DCS I/O room in accordance with Flint Hills Resources (FHR) and PIP Standards. The substation replaced 15kV outdoor load interrupt switch line-ups consisting of 2 incoming…

Read more

Terminal Expansion

This fast-track project was completed from concept to start up in 9 months and included installation of 1 main substation and 4 remote power control buildings. The project includes New 12.47KV pad mounted 6-way VFI with SEL751 protection relays and…

Read more
138kV/15kV Electrical Substation wide view

138kV/15kV Electrical Substation

This was a $12MM electrical power project. Bath provided all electrical design for a new 138kV/15kV Substation with 138kV switch and circuit breaker yard. The design included a 15kV substation building with 15kV switchgear and protective relays for the yard…

Read more
Substation Replacement

Substation Replacement

The Substation Replacement project involved Bath Group providing analysis, design, construction support, and commissioning services. The project included: Pre-fabricated substation building Power transformers Double-ended lineup of 5KV switchgear (2) Two 5KV motor control centers Substation battery system Lighting HVAC Grounding…